Thursday, November 18, 2010

1374 Progress

As I wait for an email back from the decal guy, I made some progress on some other small things. Some things worked, some need to be re-worked. I added J&J etched metal ladders on the rear of the unit. That was good. The tool box side of the weights (by the fuel tank) I like how this side turned out. I might remove a little metal from the frame later.
The rack side of the fuel tank, I need to do more material removal here and add the posts for hanging parts from. Hopefully next week I have a little time to work on it.

Hopefully by the end of Thanksgiving weekend I'll have some progress on two of my other project engines to show you (SCXY GP9 1363 and ILSX SD40T-2 203).

No comments:

Post a Comment